In the “St Petersburg Arena”, the OKNO-TV team delivered an array of media systems: an operational control area, a fully functional public address system for the arena and surrounding territory, television and radio broadcasting systems, equipping a press centre, and an intercom system.
For the first time in its history, the company developed a technology for lifting and installing the large-tonnage clusters of amplification equipment to a height of 62m. Furthermore, under extreme time pressure, a Presidential communication channel was installed.